Preparatory work before starting up slurry pump

 Preparatory work before starting up slurry pump:

1. First of all, general inspection of the equipment, and further inspection.

2. The valve of slurry pump front or behind should be in the position of parking, and should be flexible, easy to use, strict.

3. Check the slurry fluid level in the barrel or tank.

4. All parts should be complete, no shedding, loose.

5. The lubrication condition of each lubrication point shall be sufficient oil, good oil quality and clean

6. Good supply of cooling water, water quality, water should meet the requirements.

7. Before starting the pump, manually turn the opposite wheel 1-2 times. If the wheel does not move, it is strictly prohibited to start.